2024 Ultimate Bike Helmet Guide - Certified Safety Meets Comfort Tech
2024 Ultimate Bike Helmet Guide - Certified Safety Meets Comfort Tech 2024 Ultimate Bike Helmet Guide - Certified Safety Meets Comfort Tech
Cart(0)
Home Cycling Helmets Aero Helmets
Product Details
  • Includes dual pane anti-fog shield, breath box and cold weather chin curtain.
  • Modular helmet design utilizes single button action to raise chin bar
  • Advanced LG® Polycarbonate Shell.
  • Dual Density EPS.
  • Aero-Tuned Ventilation System.
  • Dual Pane Anti-Fog Faceshield.
  • Over-sized Eyeport.
  • Drop-Down Sun Visor.
  • DOT Approved.
  • Removable/Washable Anti-Microbial Comfort Liner.
  • Eyeglass friendly cheek pads.
  • Breathbox and Chin Curtain included.
  • Quick release chin strap buckle system offers micro adjustments for secure comfort.
  • Easy-Use Flip-up Chin Bar.
  • Communication System Speaker Pockets.
  • 5 Year Warranty.
Castle X CX950 V2 Modular Snow Helmet Fierce Matte Black Turquoise
  • Small
  • Medium
  • Large
  • XL
  • 2XL
  • 3XL

$ 78.61

$ 60.47

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable
You May Also Like
Cart
2024 Ultimate Bike Helmet Guide - Certified Safety Meets Comfort Tech
Your cart is currently empty.